What Your Renovation Quote Does Not Include

fixed price renovation

A renovation quote does not include the items nobody has found yet or assumes are fine: services upgrades, drainage and stormwater, site works and access, asbestos removal, termite and structural repair, council and certifier fees, temporary accommodation and making good beyond the work area. Ask for the exclusions in writing, as a list.

The gap between a renovation quote and the final invoice is rarely caused by the work quoted. It is caused by the work that was never in the quote in the first place.

Renovation quote does not include every detail: poolside at a Swanson Constructions home on Sommersea Drive, Cleveland

Here is what commonly sits outside a renovation quote, and what to ask about each.

Services upgrades. An older Redlands home often needs the switchboard upgraded, the electrical brought to current standard, or the plumbing replaced where it is disturbed. Some quotes include this. Many assume the existing services are adequate.

Drainage and stormwater. Once you change a roof line or add a footprint, stormwater has to go somewhere compliant. On sloping bay side blocks this can be significant and it is frequently excluded.

Site works and access. How the machinery gets in, what has to be removed, whether the ground is what everyone assumed. On a tight site this is real money.

Asbestos and hazardous material removal. Common in homes of a certain age in this region, and almost never included as a priced item, because nobody knows it is there until a wall opens.

Termite and structural repair. Found during demolition, not before.

Council and certifier fees, and the reports behind them. Sometimes in, sometimes out, rarely obvious.

Temporary accommodation. Not a building cost, but a real one. If the house is uninhabitable for part of the build, that is a number people forget.

Making good beyond the work area. The renovation stops at a line. The paint, flooring and finishes on the other side of that line may not match, and joining old to new is its own decision.

How to check

Ask for the exclusions in writing. Not a conversation, a list.

Then ask which of those exclusions the builder thinks is most likely to apply to your house specifically, and what it would cost if it did. A builder who has walked your house can answer that. A builder who priced from drawings cannot.

Why we investigate first

Most of the items above can be found before pricing rather than during construction. That is the entire purpose of investigating the house properly at the feasibility stage. It costs money up front and it converts unknowns into priced items, which is the difference between a fixed price and a hopeful one.

You will never get that number to zero. An existing house always holds something. But you can get it small enough that it is a manageable contingency rather than the thing that derails your project.

For the rules that apply to domestic building contracts in Queensland, see the QBCC’s guide to contract and agreement types.

Not sure what your quote leaves out? Contact Swanson Constructions or call us on 0489 080 958 to talk through what your house might be hiding.

Link back to the epic post: What a Major Renovation Really Costs in the Redlands.

What a Renovation Quote Does Not Include: Common Questions

What is usually not included in a renovation quote?

Common exclusions are services upgrades such as the switchboard, drainage and stormwater, site works and access, asbestos and hazardous material removal, termite and structural repair, council and certifier fees, temporary accommodation, and making good beyond the work area. Some quotes include some of these, but many assume the existing services are adequate.

Why is the final invoice higher than the renovation quote?

The gap between a renovation quote and the final invoice is rarely caused by the work quoted. It is caused by the work that was never in the quote in the first place, such as items found during demolition like asbestos or termite damage that nobody could price beforehand, which is why a written exclusions list matters.

How do I check what a quote excludes?

Ask for the exclusions in writing, as a list rather than a conversation. Then ask which exclusion the builder thinks is most likely to apply to your house specifically, and what it would cost. A builder who has walked your house can answer that, and a builder who priced from drawings cannot.

Can hidden costs be found before building starts?

Most of them can. Investigating the house properly at the feasibility stage costs money up front and converts unknowns into priced items, which is the difference between a fixed price and a hopeful one. You will never get the number to zero, because an existing house always holds something, but you can make it a manageable contingency.

Why are asbestos and termite damage rarely in a quote?

Asbestos is common in homes of a certain age in this region and is almost never included as a priced item, because nobody knows it is there until a wall opens. Termite and structural repair is found during demolition, not before, which is why investigating the house before pricing matters so much.

Share this:
Swanson - Renovation Survival Guide

Thinking of Renovating Your Home?

Learn how to avoid the 5 renovation mistakes that could cost you $50,000.00+

Swanson Constructions renovation at Kinsail Court, Cleveland, photo 3

Rob Swanson, Director and Builder (QBCC 1233611)

Rob started Swanson Constructions straight after finishing his carpentry apprenticeship and has been building for twenty years. The early years were spent building high end homes for other builders, which is where the standard came from. He moved into renovations because no two are the same and the work is more personal. He is hands on across every project and is usually the person who walks your house before anything is priced. In 2025 the team won the Master Builders Brisbane Region Award for Best Renovation and Remodelling Project in the $300,000 to $450,000 category.
Scroll to Top
Call Now Button